{"id":7522,"date":"2022-06-14T02:09:19","date_gmt":"2022-06-13T16:09:19","guid":{"rendered":"https:\/\/www.balineau.com\/?post_type=avada_portfolio&p=7522"},"modified":"2023-06-27T00:15:49","modified_gmt":"2023-06-26T14:15:49","slug":"emr-quay-reinforcement-brest","status":"publish","type":"avada_portfolio","link":"https:\/\/www.balineau.com\/en\/offer-portfolio\/emr-quay-reinforcement-brest\/","title":{"rendered":"MRE quay reinforcement, Brest"},"content":{"rendered":"

<\/h2><\/div>

Context<\/h2>\n<\/div>
<\/div>
<\/div>\n

As part of the development of the MRE (Marine Renewable Energy) sector, the Bretagne Region has planned an ambitious project for a quay and polder dedicated to the manufacture and transport of offshore wind turbines in the port of Brest.<\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Work description<\/p>\n

 <\/p>\n

<\/h2><\/div>

The contract for reinforcement by inclusions was won by the Balineau \/ VCMF consortium. It consisted of installing 24 to 28 m long HEB 240 type profiles by vibro-driving<\/a> and ramming<\/a>.<\/p>\n

The inclusions, numbering 1146 U, were first lowered with a vibrator into the hydraulic fill and the sandy-vastile alluvium, then by ramming with a hydraulic hammer into the schistose bedrock, altered at the top. A ramming criterion, depending on the load to be taken up in the final phase, had been defined beforehand and verified by a series of tests.<\/p>\n

The project was carried out under a strong constraint of time, the works being conditionning the completion of the main quay, and also by the exiguity of the site, in interface with other parts of the structure.<\/p>\n

\u00a0<\/p>\n

\n<\/div><\/div><\/div>

<\/div><\/div><\/div>

Location<\/span>
\nBrest, France<\/span><\/b><\/p>\n

\u00a0<\/p>\n

\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Client<\/span>
\nR\u00e9gion BRETAGNE<\/span><\/a><\/b><\/p>\n

\u00a0<\/p>\n

\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Engineer<\/span>
\n
EGIS<\/span><\/a><\/b><\/p>\n

\u00a0<\/p>\n

\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Contractor<\/span>
\nBALINEAU \/ VCMF<\/span><\/b><\/p>\n

\u00a0<\/p>\n

\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Work duration<\/span>
\nSept. 2021 – D\u00e9c. 20<\/span><\/b>21<\/span><\/b><\/p>\n

\u00a0<\/p>\n

\u00a0<\/p>\n

\n<\/div><\/div><\/div>

<\/div><\/div><\/div><\/div><\/div>