{"id":7604,"date":"2022-06-15T00:22:48","date_gmt":"2022-06-14T14:22:48","guid":{"rendered":"https:\/\/www.balineau.com\/?post_type=avada_portfolio&p=7604"},"modified":"2023-06-27T00:13:32","modified_gmt":"2023-06-26T14:13:32","slug":"grand-camp-canal-sheet-pile-excavation","status":"publish","type":"avada_portfolio","link":"https:\/\/www.balineau.com\/en\/offer-portfolio\/grand-camp-canal-sheet-pile-excavation\/","title":{"rendered":"Grand Camp canal, sheet pile excavation"},"content":{"rendered":"
In order to improve the management of rainwater in the Grand Camp district in Abymes, Guadeloupe, the Cap Excellence agglomeration community has built a hydraulic canal.<\/p>\n<\/div>
The construction of the hydraulic structures in reinforced concrete required a temporary support to hold back the earth and water during the works.<\/p>\n
Our teams installed two sheet pile enclosures by vibro-driving<\/a>, for a length of about 150m, as well as a system of waling with struts positioned at the head of the retaining walls.<\/p>\n The continuity of traffic on the roads near the structures required particular attention to the phasing and the means used to guarantee the safety of the worksite and of users.<\/p>\n \u00a0<\/p>\n \u00a0<\/p>\n<\/div><\/div><\/div> Location<\/span> \u00a0<\/p>\n<\/div> Client<\/span> \u00a0<\/p>\n<\/div> Engineer<\/span> \u00a0<\/p>\n<\/div> Main contractor<\/span> \u00a0<\/p>\n<\/div> Duration of works<\/span> \u00a0<\/p>\n \u00a0<\/p>\n <\/p>\n <\/p>\n<\/div><\/div><\/div>
\nLes Abymes, Guadeloupe, France<\/span><\/b><\/p>\n
\nCap Excellence<\/a><\/span><\/b><\/p>\n
\nArtelia<\/a> – SCE<\/a><\/span><\/b><\/p>\n
\nGrands Travaux Antillais<\/span><\/b><\/p>\n
\nDec. 2020 – Mar. 2021<\/span><\/b><\/p>\n